Serving Sullivan, Franklin & Washington County, MissouriCall (314) 393-6394
Sullivan Steel Buildings& CarportsAuthorized American Steel dealer
Menu

Site work · No. 1

Concrete pads, piers & footings

The pad is the part you only get one shot at. We form, pour, and finish slabs sized to your building's anchor plan, and we drill piers when a full pour is more concrete than the job needs. Poured and cured before your delivery week, not the morning of it.

No. 1

Concrete pads & slabs

A flat, square, anchored floor. It's what turns an enclosed garage into a building you can seal, heat, and finish.

A metal garage installed on a poured concrete pad
Photo courtesy of American Steel Carports, Inc.

A pad for a steel building isn't just a driveway with a building on it. It gets a turndown edge — a thickened perimeter the base rail bolts into — over a compacted base rock, with a vapor barrier under any floor that will be heated or finished. We reinforce with fiber, mesh, or rebar depending on what the building will carry, and we cut control joints so the slab cracks where we put the line instead of across the middle.

Square and level matter more than they sound like they do. A steel frame is bolted, not framed on site, so a pad that's an inch out of square shows up as a door that won't seal. We string and check diagonals before the truck shows up, and the finished slab gets a broom finish for traction unless you want it smooth for a shop floor coating.

UseThicknessReinforcementNotes
Carport or shed floor4 inFiber meshBroom finish, saw-cut joints
One- or two-car garage4 inFiber or wire meshTurndown edge, vapor barrier
Shop with a lift6 inRebar gridThickened pads under lift posts
Equipment or trailer storage5–6 inRebar gridHeavier base rock under the drive lane
Cabin or living quarters4 inRebar or meshVapor barrier, insulated edge if heated
Apron at the door4 inFiber meshSloped away from the building

Final spec comes from your building's drawings and what your county requires. We confirm both before we form.

No. 2

Piers & footings

Concrete where the load actually is. The cheaper way to put a barn or a cabin on ground that isn't flat.

We drill and pour piers under the frame columns and set the anchor hardware in the wet concrete. Every pier goes below the frost line — figure around 30 inches in this part of Missouri, confirmed against your county — and down to soil that will carry the load. On rock we set shallower and pin into it; in soft old fill we go deeper or widen the base.

Piers make sense when you want a dirt or gravel floor under a barn, when a slab would need three feet of engineered fill to sit on, or when you want to pour the floor inside the building later. They also keep a cabin's wood floor system up off the ground with air moving under it.

  • Drilled and poured below frost depth
  • Anchor bolts set to the manufacturer's layout
  • Sized to the column loads on the drawings
  • Gravel or dirt floor stays an option
A raised-center-aisle steel barn set on piers with a dirt floor
Photo courtesy of American Steel Carports, Inc.

Gravel pads: the third option

Not everything needs concrete. For an open carport or an equipment cover, a properly built gravel pad is the right answer and a fraction of the cost.

  • Topsoil and organics stripped out first
  • Base rock in lifts, compacted, not just dumped
  • Crowned or sloped so water leaves the footprint
  • Edged so the rock stays put instead of spreading
  • Anchors drive straight through into firm ground
  • Can be poured over later if you change your mind

The mistake we get called to fix is a gravel pad that was one load of rock raked flat over grass. Organics rot, the pad dishes, water pools in the low spot, and eighteen months later the base rail is sitting in a puddle. A pad built right gets the soft stuff out, goes back in lifts, and gets compacted each pass.

If you're deciding between gravel and concrete: gravel for open covers, equipment, hay, and anything with a dirt floor; concrete for anything you'll close in, heat, finish, or work in. See which base your building needs.

What a pour needs from the site

Before we form

The footprint has to be graded, the soft ground taken out, and the base rock in and compacted. That's excavation and grading work, and on a sloped lot it may mean a retaining wall goes in first. Utilities get located before anything is dug.

Sleeves and stub-ups

Anything that has to come up through the slab — electrical conduit, a drain, a plumbing rough-in for a cabin bath — goes in while the pad is still dirt. Tell us at quote time if the building will ever have power or water in it, and we sleeve for it. Cutting a finished slab later is loud, dusty, and avoidable.

Questions we get a lot

How thick should the slab be?
Four inches handles cars, a workbench, and foot traffic. Go to five or six inches for loaded trailers, tractors, a dump truck, or a car lift, and we thicken it further under lift posts and heavy point loads. Tell us the heaviest thing that will ever sit on it.
Do I pour the pad bigger than the building?
Slightly. We size the slab to the building's base-rail dimensions, not the roof, because the rail is what gets anchored. A common add is a four-foot apron at the door so you aren't stepping off concrete into mud.
How long does concrete need to cure before the building goes up?
We like seven days before an install crew works on it, and we pour further ahead when the weather is cold. Concrete keeps gaining strength for a month, but a week gets it past the point where anchors and traffic can hurt it.
When are piers a better idea than a slab?
When you want a dirt or gravel floor, when the ground falls away and a slab would need a wall of fill under it, or when you only need support under the frame columns. Barns, loafing sheds, equipment covers, and cabins on a slope are the usual pier jobs.
How deep do footings go?
Below the frost line so the building doesn't heave. In this part of Missouri that's generally around 30 inches, and we confirm the number with your county before we drill. Piers also have to reach soil that will actually carry the load, which sometimes means going deeper than frost depth.
Can I pour concrete inside the building later?
Yes, and a lot of barn owners do. We set the building on piers or a gravel base now and pour the floor inside the frame when the budget comes back around. It costs a little more than pouring first because the truck can't get as close, so plan the chute access.
Do you set the anchor bolts?
We set anchor bolts to the drawings when the plan calls for cast-in anchors, and we drill wedge anchors after the fact when the building uses them. Either way we need the manufacturer's anchor layout before we form the slab.

Get your pad or piers priced

Send the building size, the anchor drawings if you have them, and a photo of the spot. We'll tell you what the base should be and what it costs.

Request a quoteCall